Academic Journal of Business & Management, 2025, 7(8); doi: 10.25236/AJBM.2025.070820.
Ren Jing
Brooks Technology (Shanghai) Ltd, Shanghai, China, 201203
This paper provides an-depth analysis of the challenges facing the sample tube management equipment market and proposes a systematic approach to enhance market performance through the strategic redesign of incentive mechanisms. The analysis begins by diagnosing the current product line and market status, identifying a fundamental disconnect between a one-size-fits-all incentive model and a diverse product portfolio comprising both high-volume standalone units and complex integrated systems. Key factors affecting market performance are identified, including misaligned performance evaluation metrics and an incentive structure that fails to motivate strategic, long-cycle sales. Based on this diagnosis, this paper presents an optimized incentive framework built on the principles of strategic alignment, differentiation, and fairness. It proposes a differentiated performance appraisal indicator system and diversified incentive schemes tailored to distinct product strategies. Furthermore, it introduces a balancing mechanism to foster team collaboration while rewarding individual contributions. The final section outlines a practical implementation path, including necessary organizational safeguards, a risk assessment, and a dynamic evaluation mechanism to ensure the long-term effectiveness and sustainability of the new system. The proposed framework aims to align employee behavior with corporate strategic goals, thereby driving sales of high-value products, improving profitability, and securing a sustainable competitive advantage in the dynamic life sciences market.
Sample Tube Management Equipment, Incentive Mechanism, Market Performance, Performance Appraisal, Product Strategy, Differentiated Incentives
Ren Jing. Analysis of Market Performance Improvement and Incentive Mechanisms for Sample Tube Management Equipment. Academic Journal of Business & Management (2025), Vol. 7, Issue 8: 172-176. https://doi.org/10.25236/AJBM.2025.070820.
[1] Breda, M., Pilla, M., & Brazzarola, M. (2024). Test facility management: Responsibilities and paradigms of a new era. Journal of Pharmacological and Toxicological Methods, 127, 107505. https: //doi.org/10.1016/j.vascn.2024.107505
[2] Vincent L. Mbukwana & Ayansola O. Ayandibu. (2023). Impact of performance incentives on employees’ performance in a university in KwaZulu-Natal. SA Journal of Human Resource Management, 21 (1), 1-11.
[3] Yu, W. (2024). Research on the relationship between equity incentive and enterprise performance based on propensity score matching. Journal of Statistics and Economics, 1(3).
[4] Zeng, Y., Zhao, X., & Zhu, Y. (2023). Equity incentives and ESG performance: Evidence from China. Finance Research Letters, 58, 104592. https://doi.org/10.1016/j.frl.2023.104592